Perform Greenhouse Engineering is specialized in Greenhouse climatization systems in terms of producing customized greenhouse High Pressure Fogging Systems, projecting and supplying greenhouse Heating and Cooling systems.
The greenhouse heat loss calculation is calculated according to the region where the greenhouse will be installed. According to these calculations, the boiler room is designed by finding the boiler amount and capacity needed by the greenhouse. Hot water from the boiler room into the greenhouse is transported from underground via geothermal pipes. Within the greenhouse, the main distribution is made by the sector circulation pumps and “tichelman” piping request from the sectors. Apart from the rail and wall heating piping system, snow melting and plant heating systems can be used according to the need of the greenhouse. Greenhouse heating automation is controlled by 3-way valves used in the greenhouse sector and boiler rooms.
Geothermal Outline Pipes
Boiler Room
Tichelman Greenhouse Main Distribution Piping System